Merged: Sharing through Control Center
This discussion has been merged.
-
Can a Control Center provisioned project be replaced by a copy of another project
Hello, I have a provisioned project that was customized by a fair number of Dynamic Views that are used on the project Dashboard. I believe that Smartsheet still does not provision Dynamic Views otherwise I would have revised template set and simply provisioned new project. Now I would like to add a new project with…
-
Control Center/BluePrint and Hyperlinks not working
I am using control center / Blueprint to provision new projects. For clarification, we have a set of 8 templates that whenever we start a new project, the Control Center/BluePrint process creates a new project folder, copies in the templates, adds rows to 2 other sheets and establishes the links from our project folder’s…
-
Add Columns through Global Update that Contains Formulas with Cross-References?
I am working on a large update to a project that has 130 toolkits generated through a blueprint. I have to add up to 20 new columns that all would be a column formula containing cross sheet references to another sheet within the toolkits. My question is, if I do this using a global update, would all of the sheets be cross…
-
Control Center Archiving with Parent/Child Relationship
Hi, we are in desperate need to archive thousand of jobs created with Parent/Child blueprints. We have other archiving systems for standard templates, but the directions don't apply in this situations. Can anyone point us in the right direction?
-
Blueprint training
Good morning! With all the changes in the University, it appears there is no self-paced Blueprint training anymore, and the only way to learn is through an instructor-led course at $1800 or a $3000 pass. Is that correct or am I missing something?
-
Column Formula & Automation Gaps in Global Updates under Control Center
I am loving the capabilities in Global Updates under Control Center.However, there are some gaps I would really like addressed.Can we please create a Global Update option to do the following: Update a column formula not just a cell formula Update an automation Note: I know that I could create a new column and delete the…
-
Control Center - Global Update for Conditional Formatting
We would love to have the capability to push new conditional formatting using global update for provisioned project sheets. We have over 200 projects and whenever we get new ask for new conditional formatting (since things change all the time), it's a huge manual hours to go through and update each provisioned project with…
-
SS Control center: Disconnecting an existing profile data column...
I may be over thinking this but I want to be certain before making any changes. I have a multi-tiered CC solution. The first tier is customer level and the second tier is Project level. In the Project level toolkit I have a Project plan sheet that is the source of truth for the columns "Execution Status" and "Delivery…
-
Allow Global Updates to build cell linking between sheets
Most customer's metadata houses their profile data, some from intake sheet and some either cell linked in or brought into metadata using formulas. Needs change after design and often the new data point needed comes from non-metadata templates, which can cause a blocker if methods used are those above. If it were possible…