Control Center and Collections
Anyone know if it's possible to have control center create a collection for each project that it creates?
-
Project Name pulled from Smartsheet is not consistent
Hi! We have Smartsheet connected to Resource Manager using Smartsheet Control Center (2nd level blueprint/child folder). The naming convention for these projects always start with what we call a phase name, P1 or P2 etc. (i.e. - P1 - ABC Company - 1111 - Implementation). We have an issues where sometimes the P1 comes into…
-
Is there a way to proactively include the three baseline columns in blueprint within Control Center?
The challenge I'm facing is that these columns aren’t created until the baseline is saved on the sheet—after it's already provisioned via SCC. I’d like to add them to the blueprint template sheet ahead of time so they can be incorporated into my profile data and made available for reporting. How can I do that?
-
Dashboard Image Widget Data Source via cell from Sheet
For the Image widget type, expand ability of where to select the data source from to include option that matches that of the Metric widget - where you can choose a cell from a sheet. When using a workflow via Control Center, we intake Clients and capture their logos in a cell (as there is a nice option to insert image to a…
-
How to ensure Dashboard links remain dynamic in Control Center
My blueprint contains a dashboard that has several links to other reports/sheets within the same workspace of that blueprint. In the summary/meta data sheet, I would like to ensure that when I am referencing links to reports/sheets within the same workspace, control center will know replicate that logic in new workspaces…
-
Can a summary sheet from control center act as the intake sheet for a new set of blueprints?
We currently have two blueprints, 1 intake sheet and a summary sheet. I would like to use that summary sheet as the intake sheet for a new set of blueprints Is there a problem with this type of set up?
-
Integrate DataMesh with Control Center
I have a lot of use cases where it would be so helpful if I could provision DataMesh workflows when projects are provisioned through control center. There is no way to copy a data mesh workflow, so if I need one created for a project, I have to recreate the entire workflow, every time.
-
What would be a reason to restrict access to accessing the Control Center app to System Admins?
Hi, System Admins granting access for users to gain access the the Smartsheet Control Center application is a new concept to me. Can someone explain why Smartsheet would set up SCC like this? If there is a logical reason and we wanted to create an intake form for users who want to request access, what types of questions…
-
Control center - intake sheet data directly to summary sheet
This is a basic question but I can't seem to find a direct answer. When using control center , is there a way to get data from an intake sheet to the blueprint summary sheet without designating it as profile data? I watched SS university courses on control center and said there is a way but didn't show how to do it.
-
Considerations when adding a second Project Plan to our template through Control Centre
Hi all, I've been requested to add a second version of our Project Plan to our Workspace that runs through Control Centre. I'm thinking of simply copy/pasting our current project plan into the same sheet, and use the indentations to mark the 2 versions of the plan. I know I'll have to go through and update predecessors,…