Add a row to a sheet via Global Update
I have a sheet in each project created via blueprint and I need to be able to add a row to it. I'm looking for advice on how best to do this. For context, it's a sheet with a contact and an assignment for each contact. It can't be a single master sheet because the assignment can be different between projects. For example,…
-
Control Center: Adding new sheet template to the existing projects
Hi all, I have tried to add a new template sheet to the existing project in control center, but it seems not functioning. Is there any ways to do it?
-
Control Center: Enhanced Global Updates
Feature Request: Enable Enhanced Global Updates for Projects in a Single Workspace Our organization, like many others, manages multiple projects within a single workspace to streamline collaboration and reduce administrative overhead. This approach avoids creating numerous workspaces, which would introduce complexity and…
-
Control Center and Collections
Anyone know if it's possible to have control center create a collection for each project that it creates?
-
Project Name pulled from Smartsheet is not consistent
Hi! We have Smartsheet connected to Resource Manager using Smartsheet Control Center (2nd level blueprint/child folder). The naming convention for these projects always start with what we call a phase name, P1 or P2 etc. (i.e. - P1 - ABC Company - 1111 - Implementation). We have an issues where sometimes the P1 comes into…
-
How to ensure Dashboard links remain dynamic in Control Center
My blueprint contains a dashboard that has several links to other reports/sheets within the same workspace of that blueprint. In the summary/meta data sheet, I would like to ensure that when I am referencing links to reports/sheets within the same workspace, control center will know replicate that logic in new workspaces…
-
Can a summary sheet from control center act as the intake sheet for a new set of blueprints?
We currently have two blueprints, 1 intake sheet and a summary sheet. I would like to use that summary sheet as the intake sheet for a new set of blueprints Is there a problem with this type of set up?
-
Integrate DataMesh with Control Center
I have a lot of use cases where it would be so helpful if I could provision DataMesh workflows when projects are provisioned through control center. There is no way to copy a data mesh workflow, so if I need one created for a project, I have to recreate the entire workflow, every time.
-
What would be a reason to restrict access to accessing the Control Center app to System Admins?
Hi, System Admins granting access for users to gain access the the Smartsheet Control Center application is a new concept to me. Can someone explain why Smartsheet would set up SCC like this? If there is a logical reason and we wanted to create an intake form for users who want to request access, what types of questions…
-
Control center - intake sheet data directly to summary sheet
This is a basic question but I can't seem to find a direct answer. When using control center , is there a way to get data from an intake sheet to the blueprint summary sheet without designating it as profile data? I watched SS university courses on control center and said there is a way but didn't show how to do it.