Contingency duration based on predecessors
I was wondering if it is possible to create a task whose duration is determined by two predecessors, one from backward planning and one from forward constraints. I would like to use this, among others, to show dynamic contingency periods in my project. Let's take the simplest example, a project with the following three…
-
IF Statement and CheckBox
I am trying to get a sum of % completion based on a Checkbox. For example, if someone checks off 3-4 of the boxes, and I know the weighting for each box (as shown in the IF statement, I would like to have a sum at the end as per the screenshot. The problem is, the sum isn't working. Any thoughts...?
-
Can I create a If Then statement using a date in smart sheet?
I am trying to get a summary of duration for a particular resource within a particular month in smartsheet. This is unfortunately so that I can then input the hours into a custom ERP that lacks any intuitiveness. How could I do this? Here is an example Resource . Duration . Start Dates, End Dates LD 2 days . 8/29 8/30 AD 1…
-
Correctly nesting an IF formula for automated flagging in row with unchecked column, and passed date
Hi there I am new to Smartsheet. I've learned how to write basic IF() formulas successfully. Now I am trying to create a formula to turn a flag on if the checkbox column is unchecked. Also, I only want the flag to turn on, on or after a given date. The flag type column is called Arrived? And checkbox column is called PM:…
-
Report on Previous Entries
Hello! I'm curious what would be the best way to report a cells previous vs current value. For example, last month we had a status set to 15%, and this month it's updated to 20%. I'd like to see the 5% change as a percentage, or even an icon on a sight. Can this be done natively through the changelog, or would I have to…
-
Use formulas in percent complete column with dependencies enabled
I have a formula in my percent complete column, but when I enable dependencies (in my predecessor column and duration column) the formula gets wiped, leaving only the value behind. Is there a way to keep the formula when enabling dependencies or is this just a limitation of smartsheet?
-
How do I auto check a box based on a date + x # of days?
Can I get a box to auto check (so a conditional format is triggered) based on a date + 4 weeks? I want the sheet to auto tick a check box for me when something is 4 weeks past a specified date column. I want that to also correlate to another column that has a full harvey ball or % value of 100 or even just another tick…
-
Integrating Smartsheet and Mercatus
Hi, Does anyone know if you can integrate Smartsheet and Mercatus? Thanks, Y
-
Duplicate Columns in Report
Hello, I have four different promotional calendars that I am trying to merge into a summary. Each has month/week/day/date columns. When I create the report I want one set of those columns and then the promo/notes/$ etc from each individual sheet. Is this possible? It's very unsatisfactory to have four rows of dates with…
-
Jira Connector Sync - Rows getting rearranged
Everytime I update my plan on smartsheet that uses Jira connector, post the sync with Jira, it re-arranges the rows in a random order (maybe based on order of sync). Why does this happen and how can I lock the rows so that the hierarchy I define on Smartsheet manually never gets re-arranged but only receives updated value…