-
Username + Password authentication is still working after disabling in Admin Console
Hi all, We are using Azure AD to authenticate into Smartsheet. Recently, I disabled the Username + Password authentication option (including Administrators) with the goal of users only being able to use SSO. However, users are still able to use their Smartsheet-specific passwords to log into our instance. Has anyone else…
-
Creating Project Timeline Visualizations-Not Gantt View
I am wondering if anyone has experience with creating a high-level project timeline view to put on a dashboard--and I am not talking about a Gantt view. What I am trying to do is avoid my customer from having to continue producing PowerPoint slides manually of the data they are managing in Smartsheet. Ideally, they would…
-
Use "today" as Data Shuttle filters
Hello, In Data Shuttle I would like to create an offload from a sheet by selecting "greater than today" as a filter on a Date field of my sheet. I succeeded with "contains" "2021", but am unable to have something that works when trying with Today(), nor Today in the criteria box. And it does not work with a specific date.…
-
Integrating dashboard with reports filtered by logged in user tab in MS Teams
Hi, I'm having an issue when I add a dashboard tab in MS Teams. In Smartsheet the dashboard with links to reports with logged in user filters works perfectly. When I publish as a tab into MS Teams I get 'You're currently viewing a published version of this dashboard. This content can only be viewed in the Smartsheet app'.…
-
Bridge vs. Zapier vs. UiPath vs. ???
I'd love to hear feedback and use cases for anyone using Bridge, UiPath, Zapier, or another external system in tandem with Smartsheet (yes, I know Bridge is a Smartsheet product). I've used Zapier in the past, but only for simple tasks. The company I recently joined is using a lot of Power Automate and Flows and it feels…
-
Live Data Connector not working with Excel Data Model
I'm using the Live Data Connector to pull Smartsheet Data into an Excel Data Model. I then create a simple relationship in the data model. However when I pull the data into a Pivot Table Report, the relationship is not recognized/not honored. I've created this same simple report using data copied and pasted into the Excel…
-
Task spanning multiple sprints
Hello, I am using the Jira to Smartsheet connector to pull Issues into a Smartsheet. I have tasks and stories that span multiple sprints in scenarios when it is not completed in the original sprint. Jira's Sprint Report shows all the sprints that the story or task was assigned to. The Jira to Smartsheet connector is only…
-
Sheets and Dynamic Views
There are a few existing Sheets and Dynamic Views that were created and still owned by previous employees. Because they no longer have licenses, those sheets are broken/unable to view but still appear in our sheets. Is there any way we can delete these?
-
How to add a template to existing project in Control Center?
Hi, I would like to add a template in an existing project which was not selected while creating a project. Although it was in the required templates still the person who created it must have unticked it. I cannot add it as it is greyed out? Thanks in advance, Krunal Amin
-
Adobe Document Signatures
Is Adobe available to integrate with Smartsheet for the purpose of document signatures? Current workflow: Form submitter uploads a document to be signed by 3 individuals Tier 1 - download, sign, save, upload Tier 2 - download, sign, save, upload Tier 3, download, sign, save, upload, route back to submitter This is a lot of…