Mapping certain columns from Excel to Smartsheet
Hello, I am trying to map certain columns from Excel to Smartsheet. Currently, everything from Excel is being transferred over to Smartsheet so when I make an edit on Smarsheet, it's replaced by the Excel file every time I run it even though the column is not mapped. I only want to map the columns shown below that match…
-
Is it possible to Unlock rows through Control Center Global Update?
I have a locked row on a sheet within a blueprint in Control Center. I need to have it unlocked. More than 100 sheets are impacted. Was hoping to do this through Global Update but not finding a clear path to do it. Beginning to conclude that it is not possible. Hoping someone in the community has had experience with this.
-
Is it possible to integrate a Proof Document that is stored on the underlying sheet with a Calendar?
We are setting up a document review tracking worksheet with a front end that leverages the Calendar App. We want customers to submit required documents on a given timeframe and then use the Proof functionality of SmartSheet to collaboratively review and make changes. Ideally, these comments would integrate with the…
-
Dynamic View Function
Hello- Can you assist me on this dynamic view? On the right side "Data Center Number", there's a drop down of numbers, about 15 numbers, but I only want 111 and 112 appear on the dropdown. There are 20 associates using their own view and have their own Data Center Number. I wanted to show only the numbers they belong to…
-
Data Shuttle - Why is target sheet not showing new row added in source sheet?
I am using data shuttle between a source sheet in Google drive and target sheet in smartsheet. The issue I am having is that when I add a new row to the source sheet it is not showing up in the target sheet. and I have selected the add rows option when creating the workflow. Is anyone else having this issue?
-
Cannot access JIRA connector
I cannot access JIRA connector due to some errors. However, I can access salesforce connector. I have the enterprise license, I should be able to access both connectors. Can someone please let me know if I'm doing anything wrong? Or is there another access link? Thanks
-
Updating Duration on Dynamic View
Hi all, I was wondering, in the regular grid view of a Smartsheet, if I update a start date or duration, the end date will automatically update without saving. I created a dynamic view where I want people to be able to update the end date, but it's locked since it's included in dependencies. As a work around I am having…
-
"Has any of" filter issue
Hello. I am trying to create a filter in CalendarApp on a multiselect field. However, when I click in the box to select a value, I only see [blank] and not my list of Regions. Any idea why and how to fix it? Thanks!!!
-
Moving attachments between sheets to one combined row
I am trying to implement a workflow using two forms each one within two sheets, each of which will have attachments. The workflow is as follows: Sheet 1: A Form is filled in by an internal user, and a row is created in Sheet 1 with an autogenerated rowID and has attachments. Sheet 1: Automation requesting an update to an…
-
PDF to MYOB
Hi, looking for some assistance with sending a pdf attachment from a smartsheet line directly to MYOB. MYOB doesnt like any text or information in the email body and we have tested the send to email but it doesnt work. Is there anyway to change to default to open the document in Abode rather than a web view pdf?