Conditional lock

Hello,

 

I am trying to develop a shareable sheet in which some tasks are listed along a row and check boxes are used to indicate a task has been completed.

 

Would it be possible to lock these checkboxes if its previous one haven't been checked?

In this way a process flow would be enforced.

 

Perhaps the solution would include an IF statement, but I haven't been able to produce the results that I need.