Vicky,
Charting against Reports is in the feature enhancement list and on our future product roadmap.
Thanks
Sasan
-
Vicky,
We just released the new capability to select data from your Report. You can now select a Report you have access to and then in the chart preview panel you will find a new button called "Select Columns". You can then select specific columns in your Report you want to chart against. Hope this help.
Sasan
-
Hi Sasan,
When I am in chart preview I do not see a "Select Columns" button. It just says the report will be charted in its entirety and when I proceed there is a data error.
Thanks,
J.C.
-
J.C.,
Do you have numeric values in any of your report columns to the right side of your first column? If there are no numeric values in any column, the chart would not know what to plot and therefore, the message and Select Column is deactivated. If that's not the issue, please attach a screenshot of your report data range and chart preview panel.
Thanks
Sasan
-
I'm having a similar issue but curious why I need a number in a report when I don't need it in a sheet? I have chart by product / status using a sheet - but that requires a lot of cell linking (tried other options but most require some maintenance that for me would be more painful than cell linking.
So if I can just replace the cell linking by using a report - problem solved. But have tried 2 reports, moving primary column out of the way to get an axis value in 1st row, but nothing works same as the sheet.
Assistance would be appreciated
-
Tere,
Would you please provide examples of your sheet and report data source, the range you are selecting for the chart and the respective charts behavior for each? Examples will go a long way in understanding the situation, providing suggestions or troubleshoot.
Thanks
Sasan
-
I've tried 2 ways:
Report - all columns - selected cells (same as sheet) using the select column, I only get 1 value to plot. So I limited the report to see that helped, which is what I'm showing in picture. If I select ALL columns which is default, I get 'task' as the legend item, tried moving around the columns to see if that helped, I got a different value now Project as example, but only 1 ever plots and there are about 20 in the list. Tried selecting only 2 columns, then I get an error message (shown in pic)
-
Never mind - I'm an idiot LOL, I did my 1st chart off of a formula sheet which is built by project/status - dashboard references it, not the master sheet. So what I have to figure out is formula to multiple sheets (yuck) or formula to report (which isn't possible it seems) - back to drawing board
Categories
- All Categories
- 14 Welcome to the Community
- Customer Resources
- 64.8K Get Help
- 434 Global Discussions
- 138 Industry Talk
- 470 Announcements
- 4.9K Ideas & Feature Requests
- 129 Brandfolder
- 148 Just for fun
- 65 Community Job Board
- 486 Show & Tell
- 33 Member Spotlight
- 2 SmartStories
- 300 Events
- 36 Webinars
- 7.3K Forum Archives