Reports needs improvement. I like the idea but can't i report to a graphic or a bar graph or something like that? The report filtering is hard. For example, i want to filter to the high level tasks like and not all the detail. To do that i have to filter using another column to select. I should be able to report on a few high level tasks and smartsheets shoudl not make me find it.Β
Comments
-
Hello,
Β
I'd love to send feedback to our Product team on how we can improve the reports functionality. To make sure I understand you, can you elaborate on how a high level task is formatted on your sheet? Are these parent rows? Do you apply special text or cell background formatting to indicate that these are high level tasks?
Β
Thanks in advance!
-
what i would like to see is a report that has the same hierarchyΒ as the project and/or that i can choose to add or not.
Β
A report that has a list of dozens of flat tasks makes no sense at all.
Β
Take for example the following basic hierarchy:
Electric Car Prototype10%Β
DesignΒ 40%
Β Β Β Β Β Β Β Β Β Β Β Make schematic drawingΒ 90%
Β Β Β Β Β Β Β Β Β Β Β Create Bill of MaterialsΒ Β Β Β Β Β 80%
Β
Β Β Β Β Β Β Β Task 0%
Β Β Β Β Β Β Β Β Β Β Β Β Task 0%
Β Β Β Β Β Β Β Task 0%
Β
Construction Β Β
Create Layout drawingΒ Β Β 76%
Β Β Β Β Β Β Β Β Β Β Β Order partsΒ 0%
Β Β Β Β Β Β Β Β Β Β Β Build Panel 1 0%
Β Β Β Β Β Β Β Β Β Β Β Build panel 2 0%
Β Β Β Β Β Β Β Β Β Β Β
If I run a report on what tasks are above 75% complete, I should see the following:
Β
Electric Car PrototypeΒ
DesignΒ
Β Β Β Β Β Β Β Β Β Β Β Make schematic drawingΒ 90%
Β Β Β Β Β Β Β Β Β Β Β Create Bill of MaterialsΒ Β Β Β Β Β 80%
Β
Construction
Create Layout drawingΒ Β Β 76%
Β
And NOT just:
Β
Make schematic drawingΒ 90%
Create Bill of MaterialsΒ Β Β Β Β Β 80%
Create Layout drawingΒ Β Β 76%
Β
Β
And if I run a report to find tasks less than 25%,Β I should not see:
Β
Electric Car Prototype 10% or i should be able to select and easily filter which level ofΒ hierarchy i want to display. Β Because these are not a tasks. They might be deliverables though. But I should be able to select if it shows or not.
Β
Similarly, if I want to run a report on the status of a high level deliverable like Panels 1 and 2 like this:
Β
Panel 1 50%
Β Β Β Β Β Β Β Β Β Β Β Task 1.1
Β Β Β Β Β Β Β Β Β Β Β Task 1.2
Β Β Β Β Β Β Β Β Β Β Β Task 1.3
Panel 2 30%
Β Β Β Β Β Β Β Β Β Β Β Task 2.1
Β Β Β Β Β Β Β Β Β Β Β Task 2.2
Β Β Β Β Β Β Β Β Β Β Β Task 3.3
Β
I should be able to issue a report on
Panel 1: 50%
Panel 2: 30%
Β
Right now, that is a hard thing to do easily and i can only do it by adding a flag in some other random column.
Β
Β
Does that make sense?
Β
ALso, it would be cool if i could make a graph of per cent complete.Β
Β
Β
Β
Β
Β
Β
Β
Β
Β
Β
Β
Β
Β
Β
Β
Β
Β
Β
-
Hello Michael, thanks again for the detailed explanation.
Β
I've passed this on to our Development team based on the other thread we have going that refers to the Sights and Reports enhancements you're wanting.