-
Apply Column Formatting (Percent and currency) Using Global Updates
Please add the ability to format a column with percent, currency, decimals, etc using global updates. It would be nice to be able to configure when creating the global update in the control center. At minimum, column format should be included when I run a global update on a column I've already added to my template.
-
Re-using an entry from a project already provisioned in th intake sheet.
We manually archived a project but didn't delete the row in the Project Intake Sheet. Now we need to re-provision a folder toolkit for that project and I'm wondering if using the same entry (just unchecking the "Created?" column will create any other issues. If that's the case, deleting the entry and using the same info…
-
Control Center Multi-Tier References
I'm looking to create a project provision that uses a catalog that exists on the parent level, but when I provision a project using these links, it links to the blueprint catalog, not the provisioned parent project catalog. Is there any way to rectify this? I thought that links would propagate based on the blueprint…
-
Control Center - Ability to launch a blueprint based on intake choice
Hello Community, Is there a way to configure Control Center to launch a blueprint based on a entry choice in the intake? Specifically, I have 3 separate blueprints for Small, Medium and Large projects. I would like to be able to have Control Center's automation launch the corresponding blueprint based on the project size…
-
Unable to edit Blueprint in Control Center (I am Primary Lead)
Hi All, Hoping for some help that I have been unable to get from Smartsheet Support. I am the primary lead of our Blueprint, but when I go to edit the blue print I can get through the Blueprint Basics tab all the way to Profile Data Selection and then the site freezes up. While the Blueprint and provisioning work…
-
Merged: Global Update on Sheet Summary
This discussion has been merged.
-
Global update for [Latest Comment] column
I just tested [Latest Comment] column in the blueprint does work when we provision project, however, when we do the global update (even using the template, it does not work and we have to do it manually to set up correctly. Per Smartsheet Tech, currently there isn't a way to change column property to Latest Column in the…
-
SCC Fails to update links error
One issue we are having is automation from SCC at job creation to send specific information from a project to Intake sheet. Here is what logic we applied and the error we get, can you look and maybe advise a solution for us? On Intake Sheet, we have the fields “PS Start Date” and “PS End Date” that are set push from…
-
Calendar App Automations (API + SCC Integration)
Would like to utilize Calendar App within Control Center-generated Dashboards (embedded link), however, these need to be manually generated for each provisioned project. Please consider integrating Calendar App within SCC to allow for calendars to be generated and embedded automatically upon provisioning a new project. The…
-
Why isn't the background color of my forms carrying over to new projects?
In the project blueprint, we have forms set up & the background color is set to blue for all forms. However, when we create new projects, the background color of the forms is showing up white (making our white logo invisible). Is there a way to fix this? Has anyone else had this problem of the background color reverting to…