Hi, I'm still new to ss and how to use free downloads! I'm stuck on how to use the Weekly Project Status Report Template like its shown in the image marked "report layout". I downloaded the template t…
I am attempting to create 2 separate dashboards, for 2 different regions, from a single Smartsheet, using Sheet Summary. I can not seem to figure out how to name the summary fields the same or convers…
Good morning, I need to report on data spread over 50+ sheets that are updated independently. The plan had been to place all these sheets in a single workspace and run a Dashboard or a Pivot referenci…
I would like to have the option to tell links to open in the same tab for my dashboards. I have some internal company wide sheets that I have shared by publishing in order to bypass setting up permiss…
I have a master sheet that has 100 projects all different end dates. Trying to find a formula or method create small chart like a sample Jan 2022 - 4 Feb 2022 - 3 Mar 2022 - 4 Etc...
I want to make an interactive dashboard. Can I embed a task list into my dashboard, of my Project template set, that will link to the new copied smartsheet? The simple answer is it links back to the o…
Hi, I've shared dashboards to unlicensed users in my company with "admin" permission. However, some can edit the dashboard; some can't (they don't even see the pencil icon near the share button). I do…
I have a dashboard widget that is referencing a sheet that recently met the 500,000 cell/row limit. I thought breaking out my sheets by year would be enough space, but I was wrong. Is there a way to k…
The data below is what I am trying to chart as a pie chart. The pie chart is only showing 708.14 and 1992.83 but if I make the same chart a bar graph it shows the data correctly. Why is this?