-
Improve Load Times
Our consistent experience is that Smartsheet objects can take anywhere from 5-20 seconds to load. This feels extremely slow when you're actively facilitating a call and working between sheets, waiting for it to load. Other solutions in the industry have extremely fast, sub-5-second load times. I would request the product…
-
Cell-level Comments
Cell-level comments would be a huge time saver (similar to Excel) and in the Comments feature bar there could be a tab at the top that reads "Cell" next to the "Row," "Sheet," and "All" tabs. Currently, I'm spending a lot of time describing columns and going back and forth on communication to confirm columns and which…
-
Smartsheet Notifications
I'd like to get notified when a new smartsheet or workspace is created for the entire organization. Along with a weekly update of what's been updated. How can I do this? I am managing ~100 Smartsheet's and I need the big picture incase someone starts something without overseeing and including them to roundtable…
-
Form Upgrade to Pull In Data from Another Smartsheet Source
It would be extremely helpful if there was a way to have data pull into a form from another Smartsheet source based on selections made within the form. Example: On the form there is a dropdown to select a client property number. The property Name, Address, and any additional property information are then pulled into the…
-
Merged: Freeze top row
This discussion has been merged.
-
Sorting by Time Not Working in Card View
In Smartsheet, there is an issue with the ordering of flight times when using Card View. In Grid View, the flight times appear sorted correctly (e.g., in chronological order). However, when switching to Card View, the cards are not displayed in the same order based on the flight time. This is challenging for our workflow…
-
Merged: Open Link in New Tab Option for Dashboard
This discussion has been merged.
-
Merged: Copy an automation from one sheet to another
This discussion has been merged.
-
Dynamic View Logic should behave like Conditional Form Logic (aka "live")
Logic in Dynamic Views should work as it does in Forms - changes / info entered while filling out the form results in changes to the form based on established logic. Instead, DV Logic is applied only when a request is loaded or saved. This is a follow-up to an old discussion on Dynamic View logic behavior (here) PAIN…
-
Browse vs Workspace view
When I open Browse - I would like to be able to see EVERYTHING in all Workspaces. Having two different views is ineffective and not industry standard. If I click on a Workspace - the Workspace option does not appear in the left panel until I click on a file/object with in the workspace. Why? Also, being able to see Dynamic…