HYPERLINK API
We have been using HYPERLINK("http://website.ws/links", "Click Here") in both excel and google spreadsheet, and since we need jotforms integration for client our current links in smartsheet is very long and creating hyperlink manually for each row is a terrible ordeal. It would be great if you add HYPERLINK("URL", "Text")…
-
Workflow and cell linking.
I have two sheets that have linked cells. I want to use the workflow to make the tasks from the second sheet disappear if the Status column says complete. Is this possible? I know how to set up a workflow to move cells to a new sheets but it does not seem to be working. Is this because I have the cells linked to another…
-
How to create a time gauge or something similar?
Hello, I am trying to create a widget to display on a dashboard. This widget will give the viewer an immediate idea of where the project is in the project timeline. Ideally, the widget would look like the time gauge image attached. There would be 4 segments instead of 3. The needle depicts where the current date falls on…
-
Add date to formula
Hi I am currently using this formula =SUMIFS([Number of Slides]:[Number of Slides], Done:Done, 0, Status:Status, "Handed to Pathologist") I want to look at the date for the next 30 days. I have a column titled "Due Date" with dates (2/20/2021) in them. I want the total number of slides in the next 30 days. Could you please…
-
How to add date to formula.
Hi so I am using this formula =SUMIFS([Number of Slides]:[Number of Slides], Done:Done, 0, Status:Status, "Not Started"). I want to also only filter by a certain date. how do I add that. There is another column called "due date" and there are dates in it. How do I only look at stuff due this month by adding it to the…
-
How to change formula for more then one criteria
So this formula works for me. I am trying to add another criteria though and cant figure it out. =SUMIFS([Number of Slides]:[Number of Slides], Done:Done, 0, Status:Status, "Stained") And it works but i want it to add the "stained" and "staining in progress" in the same column. how to i rewrite the formula in order for it…
-
Imported Formulas from Excel
Happy Wednesday! I have been going in circles trying to figure out where this formula is going unparseable. I researched it against other similar (working) formulas in smartsheet and the Formula errors guidance- but I am still missing it- hoping a fresh set of eyes can help me pick out the culprit. Thank you!…
-
Branding smartsheet links
Can i brand all link on smartsheet to my domain link like mapping , for example smartsheet.mydomain.com Thank
-
Sorting Rows
Hi, I am working on something that requires to sort the Smartsheet based on a column. The type of column is 'TEXT_NUMBER'. 1/0/12 1/0/1 1/0/14 1/0/3 1/0/11 After sorting the smartsheet with the above column the result is this 1/0/1 1/0/11 1/0/12 1/0/14 1/0/3 I am using python sdk in my project, but it doesn't sort all the…
-
Sum Column Divided by Two Summed Columns
This is the formula I'm using, but I'm getting unparseable: =(SUM([Actual final door count]:[Actual final door count])) / SUM([Inspection & minor repair labor hours]:[Inspection & minor repair labor hours] + [Repair labor hours (return trip)]:[Repair labor hours (return trip)])) Here is what the data looks like: I need the…