Hi,
I have a sheet where we want to monitor the value of a project simply with a 1 to 3 star rating, but the only star symbols available are either an on/off, 1 star symbol, or a 0-5 star rating.
Is there any way of reducing the mount of stars to simply 1-3, or is there a formula (similar to the RYG ball) to show this?
I am aware that there are other 3 stage priority symbols, but none of these adequately show what we need to them to show (at least not simply enough to get our point across). Is is possible to edit any of these?
Callum