Reference a date based on Percentage complete

✭✭✭✭✭
edited 12/09/19 in Smartsheet Basics

In Sheet One, there are 25 products assigned to 4 Product Types. Each Product has an expected delivery and an actual delivery date.

In Sheet Two, we want to add the dates associated with the percentage complete.

The existing formulas provide the percentages and totals but how can I add the dates for the milestones. For example, what is the date that 25% of Product Type Three was delivered. It should be:

25% Delivered = 10/14/19

50% Delivered = 10/15/19

75% Delivered = 10/17/19

100% Delivered = 10/18/19

Thank you for your help.

Sheet ONE_Find date for percent complete.png

Sheet Two_Find date for percent complete.PNG

Comments

Trending in Smartsheet Basics

  • I have a dashboard that is using a Metrics Widget to display summary data. I want users to only see the summary data for their region. What is the best solution to achieve this? Is Dynamic View a solu…
    User: "Christopher S"
    Answered ✓
    16
    3
  • Hello! I am very new to smartsheet - lots to learn! I have a dashboard that has a metrics table at the top which is from a report. The report is a simple table which uses =SUM equations to get the yea…
    User: "Hester"
    Answered ✓
    19
    1
  • Hi Smartsheet Community, I was working on a dashboard and clicked the "wider canvas." When I was about to return it to its original view, the wide option was no longer available. Can you please help m…
    User: "OSE Helpdesk"
    Answered ✓
    23
    2