Hi,
We need a way to download all attachments in a Dynamic View at one time (vs having to download them one by one). This is an available feature in the regular sheets. How do we do this in dynamic view?
thx
Sign in to see the current vote count, add your own vote, or leave a comment.
I have the same question as above.
Yes, downloading each file at a time is quite time-consuming.
Also, it would be handy to delete all attachments in a row instead of one at a time.
Any chance this would be prioritized soon?
This need to be a priority. What's the point of having a dynamic view for team members if they have to go to the sheet to get all the attachments in bulk. We currently may have over 50 attachments that need downloaded. This is a burden.
It would be extremely beneficial to have the ability to manually assign colors to individual projects within the Timeline View. Currently, project colors are automatically determined by the Dashboard Theme, which limits flexibility and makes it challenging to visually differentiate projects in a meaningful way. Allowing…
As the smartsheet admin for Europe, it would be extremely helpful to be able to view all Automations / recurring emailed reports in one place as opposed to sheet level. It's almost impossible to ensure everything is working correctly / delete recurring emailed reports without this.
It would be nice to be able to deactivate all automations at one time when I need to work on a sheet. Then to be able to activate all of them at one time when I am finished. One of my sheets has 48 automations. It is extremely time consuming to deactivate them one at a time. Thanks! Freda