-
Can you create a workflow to copy a row to between sheets in different Workspaces?
I'm creating a workflow that copies a row from one sheet to another, wherein the sheets are in different workspaces. I saw that you must be an admin or owner on both sheets to do this and I am listed as an admin on both sheets. However, the sheet name I'm copying TO does not appear in the search results. But, sheet names…
-
Permissions Workspace vs Sheet
I want to set a Workspace permission for all members (except Owner and 1 Admin) to Editor - Can Share, which I'm able to do. Within that workspace are some files that I want some of the members to have Admin permission, but still only have Editor permission for the other files in the Workspace. When I open the sheet for…
-
Dynamic Views in Workspace
Hi Product Team — Currently, to reach a dynamic view from a sheet, one must go through about 3 clicks and a separate window spawn. Dynamic View»Manage Dynamic Views»Dynamic Views from this sheet»new window spawn»click the dynamic view needed. It would make accessing dynamic views easier and faster if we could put them into…
-
When I Copy Workspace, Everything Copies Fine Except for CellLinking
Hi, Using the API documentation, I'm able to copy entire workspaces which has been great for scalability. I've been noticing that the only thing that doesn't work correctly out of all the sheets, reports, and sights, is the cellLinks in my sheet. In the instructions, you can tell it all the different things to pull in. I'm…
-
Workspace Reports
I want to run a report that shows activity across all of the sheets within a workspace so I can see which pages are viewed the most, have the most edits done to them, etc. So surprised this reporting isn't readily available now. The workspace is great, but is seriously lacking without this capability.
-
Can we turn off the side folder menu that pops up EVERYTIME we open a sheet or report?
Everytime we switch from one sheet to another, the side menu folder structure opens up. To be clear - at our arrival to our destination sheet, the side menu folder structure opens up, and takes up between 15%-25% of the screen. We have to use the mouse or track pad to close it. This is a slow process and very annoying.…
-
Workspace permissions based on Admin level?
As an Admin level permission in a Workspace, can I create new Sheets, Forms, Reports, and Dashboard in the Workspace? I'm testing it out and it seems like the Owner of the Workspace is the only one able to create new Sheets, but I was wondering if I was missing something since I thought that the Admin level would also let…
-
Workspace Restoration upon recovery from deleted folder - suggestion
Suggestion - If a workspace was deleted then restored. It would be nice to have the fully workspace restored. Current state: Delete workspace items (sheets/reports/dashboard) are restored into the Owners sheets folder. Future state: Delete workspace are restored back into original workspace (not into owner sheets folder)
-
Project Intake form in one workspace updated the Intake sheet in another workspace
Hope everyone is doing well. I would appreciate any insights you may have. I used the Project Management Template (PMO) to create an new workspace. Did this by saving this folder structure as NEW and called it MS Onboarding Lite. PMO structure: MS Onboarding Lite The first time I used the PMO to create a workspace was for…