Currently there 3 Time Entry locking possibilities in Resource Management to choose from:
1. Do not lock time for a project
2. Lock all time entries for a project
3. Lock time entries for this project that are older than xx number of calendar days.
Idea: enhance the Time Entry locking states by introducing additional options:
- lock the project for new time entries based on a start and end date.
- specify a range within which time can be tracked against the project.