How to create a master schedule sheet in project prog schedule mode by linking other schedule sheets

Javier Ortiz
edited 09/09/21 in Smartsheet Basics

Hello, first of all sorry for my English, I'm doing a translation from French.

I work in the construction industry and we have big construction projects. Each major construction project includes several complex tasks. Each of these tasks is a project in itself and it has its own schedule. The goal is to bring together all of these building restoration, construction or refurbishment projects of the same building as one "program" of projects.

To do this, we want to combine multiple schedule sheets into a single master or parent schedule sheet. The goal is to track the entire program through a single sheet (schedule) that is linked to the other "child" schedule sheets.

Do you believe that it is possible to tie all the schedule sheets into one large sheet and synchronize them on a single critical path?

Best Answer

Answers