Getting cell history of all rows (say 10,000)rows in a smartsheet
How to get cell history of all rows in a smartsheet without any error (rate limiting error).Using python code.
-
Unticked boxes to trigger reminder dates
In my project sheet, I have a Task Complete tick box. I would like a date to be placed in the Reminder Date column if the box is not ticked by the Estimated Delivery Date. Is this possible?
-
Using check boxes and flags in formulas
In my project sheet I have checked boxes and flag. I would like to include them in my formulas. Example: If the box is unchecked by X date then the X date will appear in a reminder column.
-
V-Lookup referring to multiple sheet
I'm trying to link cells pulled from other sheets called {Projects Info 2018 CG1-5,10} & ,{Projects Info 2018 CG 6-9}. When the column called "project" in my sheet is the same as in {Projects Info 2018 CG1-5,10} & ,{Projects Info 2018 CG 6-9}, then return result from column 14. When using the following Vlookup formula in a…
-
Multiple Project Task List Roll Up
Hello, Is there anyway to have a project task list that is updated from multiple project task list sheet? We are looking to have a master roll up of the Project Milestones without including all the tasks on 1 task list. Thank you
-
Referencing a predecessor in formula
Hi, I would like to change a symbol cell based on the status of a predecessor completion status i.e. "If a predecessor completion status is 100% then the status of this raw should change".
-
Dynamic lookup for Project Master Rollup
I would like to create a master project rollup to track projects, and do not want to set up cell linking every time a new project is added. To this end can we create a dynamic lookup so all the user has to do is type the name of the sheet referencing the new project into the master rollup?
-
Populate Dates Between a Start Date and Finish Date
Hi, I am trying to create an element of capacity planning for the company i work for, and am having issues with the start date and finish date. I have a master production planning sheet which has a basic start date for the job, and a finish date for the job. This shows it nicely on the gantt chart and all the days that are…
-
Link limits regarding Vlookup
My question is regarding this statement: "There's a limit of 25,000 inbound cells that can be referenced from other sheets into one sheet in total." If a cell on the inbound sheet is reading a range from another sheet, do all the cells in that range count against the inbound sheet, or is it just the one cell that is…
-
Cell linking report sheet linking
I have created a set of reports (that selects this project) and an overview/summary sheet that has links into the underlying Project Sheet. We use these set as a template to save an copy to a new workspace or folder for each project. I am hoping there is a way to make the project/sheet links stay within the…