Send a link to a report to users that have tasks due that day
I'm not sure what the best work flow is for this but here is my current setup: * I have a task list with all tasks for the duration of a project. * I have reports that list all tasks due within the next day or week for the "current user" * Currently users get alerts for every task that is due on that day (multiple alerts /…
-
Calendar App Tab Name
As someone who is always rocking 2-5 open tabs in the calendar app, it would be EXTREMELY helpful if the name was on the tab title at the top of my browser. When I am looking for a specific calendar, I have to click through all my open calendars (they all just say "Smartsheet Calendar") to find the one I'm looking for
-
Metric Sheet -Showing Trending
I set up a metric sheet that with CountIfs formulas to show Monthly Stats.. I just realized that when I change the reporting period on my source sheet , I will lose the value counted in the previous reporting period... Is there a way to lock the data values in the previous reporting periods... arggh
-
Reporting/view - A3
Hello, Has anyone created a view or report which mimics the look and feel of A3 documents popularized at Toyota? Thanks! Mark
-
COUNIFS formula when multiple contacts
I have a sheet with columns such as "Status of Request"(Dropdown list: New, In Design, Completed) and "Assigned Designer"(My assigned designer column allows multiple contacts). I want to count how many projects under the status "In Design" for Designer "Luis" do I have so I have the formula =COUNTIFS([Assigned…
-
Link to another sheet and add additional days
Hi there, I am trying to link to a master schedule but adding some additional days to define my drop dates. Please help. Thanks.
-
How to exclude values from a COUNTIF expression
I'm writing a COUNTIF formula referencing a column with multiple values that works well, until I try to build an expression that says: I want you to count the values in this column as long as they are NOT "x" OR "y" OR "z". Can anyone help with the proper syntax? I've tried the following but it doesn't work: COUNTIF…
-
SUMIFS Cross Sheet Issue
Hello Everyone! I am needing help with the SUMIFS formula for cross sheet reference but when I enter multiple criteria, it returns a value of 0. What I am trying to accomplish is a sum for Sheet-2 based on multiple criteria from Sheet-1: Criteria from Sheet-1 * Job ID* 216116 * Cost Code ID* 7 * 15 * 16 Sum Range: Act.…
-
Use of the system column to get the modified date
Hello everybody, I am trying to automate the input of the modification date of a particular cell on my sheet. I figured that since this information is already available in the system column [Modified] - I'd like to take that info to put it into another cell (with Date properties) Thanks in advance for the support Chris
-
Dependency Settings specific to each day
Is there a way to allocate specific hours on individual days e.g. Mon 7 hours , Tuesday 8 hours etc