We have a workspace with several sheets and dashboards. We want to copy this workspace for each incident we activate for. Is there a way to have the links within each dashboard automatically update to the workspace/sheet location? Currently we have to go into each dashboard and update the links - very tedious. We are using the dashboards as tabs in MS Teams and essentially have a workspace for each MS Team since currently we can only embed the dashboards/sheets via a Sharepoint page. Gov tenant currently doesn't have the Smartsheet connector.
Hope that all makes sense.
Comments
-
Yes. When you "Save as new..." there should be two options at the bottom. Just make sure the one that says "Newly created sheets" is selected.
-
I am also having this problem, and I've tried those exacting settings with Save as New - it still breaks the linkage between the sheets and dashboard. I've tried copying at the folder level within a workspace as well as copying an entire workspace - neither one works. Is anyone else seeing this problem?
-
I would suggest reaching out to support. This works very consistently for me, and all of my coworkers and we do this if not once a week then two or three times a week.
-
I'm having the same problem. I find that some links will update, while others do not.
Links between a newly created report and the newly created source sheet do update.
However, the links on the dashboards do not update. They maintain the links to the source document that I attempted to clone.
I created my dashboard using Rich Text Widgets. I wonder if I'd get a different result if I use Shortcut Widgets.
I'll test and report back.
Categories
- All Categories
- 14 Welcome to the Community
- Customer Resources
- 64.9K Get Help
- 441 Global Discussions
- 139 Industry Talk
- 471 Announcements
- 4.9K Ideas & Feature Requests
- 129 Brandfolder
- 148 Just for fun
- 68 Community Job Board
- 494 Show & Tell
- 33 Member Spotlight
- 2 SmartStories
- 300 Events
- 36 Webinars
- 7.3K Forum Archives