How to determine how close I am to linking limits
Hi all, Is there a reasonable way to know if I'm getting close to the cross sheet link limits? Thanks, Darrell
-
Link a summary sheet to multiple workplans
I'd like to be able to link to fields in a separate worksheet based on certain criteria. I'll give an example to try and explain: I have multiple projects running concurrently; each has a separate project plan as they are shared with different stakeholders. Each project plan has an overall RYGB status, based on the 'worst'…
-
Building a Dashboard from a Report
Is this possible? I went to try and create a metrics sheet from the report but it doesn't show up. Building the report was supposed to group all of my similar items together, why can i not then build a metric sheet to create my Dash based upon that report?
-
How do Link a Column w/ drop down items between separate forms/sheets?
I'm new to SS. This is my first project. I have an audit process I am building for a customer. There are 5 separate forms needed for the audit process. I originally had all 5 forms feeding the same sheet but with over 100+ columns for each audit, I went crazy scrolling left to right looking for the information I needed and…
-
Gantt rollup for multiple projects
We are trying to rollup multiple project sheets that have tied in metrics. The gantt view is not allowing us to have the dependency arrows on our rollup. Do you have any suggestions how to create this? We have multiple tasks on our project sheets that have dependencies but our phases do not. I tried copying the dependency…
-
Report not pulling all sheet rows w/ linked cells
My Sheet contains all linked cells. There are 4 rows. I create a report to pull everything from the sheet with no conditions (Who? What? When?) but I only get back 3 rows. I have tried adding additional rows to the sheet but it still only returns 3 rows Help?
-
Using COUNTIF to determine quantity of rows with number not ending is 000
Hello, I'm trying to setup a "Line Quantity" of children where the primary column contains a 5 digit number. These numbers indicate line items of a purchase order and have a hierarchy themselves. The numbers that are considered the parent end in 000 with all the items that are children end in various numbers in increments…
-
Strip Time When Linking Max Modified (Date) Cell to Column with Restrict to Dates
Hi Smart Sheet Community! I am applying a formula to a cell in our project schedule sheets that I found in a couple posts to grab the MAX value of the Modified (Date) column: =MAX(Modified:Modified) + "" My colleagues and I will be linking the cell with this formula from our project schedule sheets to a "Last Updated"…
-
Cell Linking
Hi all, I have currently set up cell linking, however I only want it to cell link once the drop down box has been changed to 'Converted'. As in, we receive a lead and add the data to that lead. Once that lead is 'won' or 'Converted' I change the drop box to show this. Once this is done then I want it to move onto my other…
-
SCC Nesting Summary Data
Is it going to cause any issues if I nest (indent a couple levels) data inside a sub-category, inside of a main category? (see attached img)