Group automation workflows on sheet
Hello. I have an approval sheet with 11 categories. Each category contains automation workflows with between 5-7 steps each. My workflow window is very messy and complex. Is there a way to group each category of workflows into a "folder", or some type of set? If I can do this, is it possible to clone an entire set of…
-
Ressources view in details
Hi, Is there a way to see more details about task in the ressource view? By example, in ressource view, I would like to see % for each task and not a global % for the sheet by user.
-
Published Smartsheet item is not accessible when integrated with MS Teams channel as a new tab
Hello, I have embedded a sheet from Smartsheet to the MS teams channel as a new tab and gave edit rights to my colleague. I have also shared the same sheet to the same user with admin rights in Smartsheet. My colleague cannot access the sheet in MS Teams and getting the above error message. How to give the sheet access and…
-
Display of Project Plan report on dashboard
I am having issues on our dashboard with the display of a Project Plan Report. the Gantt Chart overrides the columns and needs manually dragging each time to allow you to see the data. There is enough room in the widget to show all the details fully as when you move the slider if all fits without slide bars needed. If I…
-
Why are my proof uploads getting stretched?
I am uploading PDFs to the Proofing section and they are getting stretched beyond recognition. My files are PDF files, not sure what is going on. Here is a screen cap:
-
Plotting a Graph - Needlessly Complicated?
I have a sheet, each line contains an entry that tells you the following info: Date, Item, Status, Count I'd like to plot a graph over time that shows the X axis as the date, Y axis as the count. I'd prefer a stacked bar graph that has all Statuses in one stack per day. Example: 1/1/20 - Snacks - Eaten - 2 1/1/20 - Snacks…
-
Reports: Unable to Update Dates or Sort by Dates
Hello, I have 2 issues with my reports sheet For some reason, on my reports i'm able to update the dates sometimes but not at other times. Its not consistent. When I try to sort the dates on ascending so that the earlier dates are on the top and the later dates on the bottom, it doesn't work. It worked before but not…
-
Disable editing the row after checking checkbox
Hello All Is it possible to lock, or disable editing a row in SS after the checkbox has been checked for that row? If yes, would it be possible to even add this option for a specific user? (meaning me, as an admin can still edit anything, but a foremen, who has checked the box, cannot edit the row afterwards) Thank you
-
Which underlying sheets need refreshing for report to be accurate?
Hello, We've been having issues at work regarding setting up automatic report emails where the recipients receive reports with old data. Is it still true that if I have an underlying Roll-Up sheet (made from a Master sheet where all data arrives) based on which I have a Report - I must "touch" the underlying Roll-Up sheet…
-
Sheet Linking - Project sheets to single metrics sheet
Hi, I have about 80+ projects running simultaneously. In each project sheet, I have some basic project information & metrics (duration of each milestone calculated from actual start & finish dates) which needs to be tracked and analysed. The information & metrics from all projects should be collected in the Metrics sheet.…