Smartsheet Support Documentation does not have a way to duplicate, copy, or export a group in admin.smartsheet.com/manage/groups There is, however, a workaround that doesn't appear to be posted anywhere so I'm sharing it here: Open the group in the group list at admin.smartsheet.com/manage/groups Select "View Group" Select…
Hi Guys, Created a basic script to download all PDFs from a sheet. Use case: I use Document Builder to create documents from field inspections. However, we need to store these in sharepoint for redundancy. This script basically pulls all "PDFs" so you can then migrate them where you need to. I don't want to pay an…
I was trying to use the Scheduling: Create Workflow Schedule module in Bridge to set up a 60-minute timer that would alert our team if another workflow didn’t complete within that window. I was struggling with how to pass and access state values between the workflows. After working with a Pro Desk support agent, we figured…
Hello Community, I am looking for some help with a helper column checkbox formula needed to support reporting of data to a dashboard and downstream formulas. I have four shifts (A,B,C,D) entering data points into a sheet, with the potential for multiple line entries occurring per shift per day worked (see example below). I…
As a sourcing analyst I have to take multiple pricing summaries from our consultants and enter the information into our Smartsheet. Currently that means a lot of copy and pasting and painful data entry. My question: Is there a way I can take the PDF they send me and drop it in Smartsheet and it auto populate my sheet based…
Hi all, I just found out how to put new submissions appear on the top of the sheet, but I have old entries that I want it to be included to the top. I want these changes to apply to the old entries, how can I re-arrange these old entries? Thanks.
When trying to add an entry via this Panel on the Details panel on the right, it give me the error message shown below that. Every time, even in different sessions, refreshed, restarted, etc. Can this be done? If not, is there a workaround for quick entry right into the Calendar?
Hi, I have a team that wants a solution that I can't figure out. Any help would be greatly appreciated (even if its a round about way to a solution). Trade submits inspection via form - generates a document/report, and This triggers a notification to Contractor 1 and Contractor 2, so that they complete their independent…
It looks like you're new here. Sign in to post and engage.