Revising duration so it doesn't count first day
I want the range of days from Monday the 1st to Monday the 21st to read 21 days; yet it reads "22 days" in the duration column. This is because day 1 is the first day, when I need "day 1" to be the following date from the first day. Is there any easy way to fix this? In my job I can never count the first day as day one as…
-
Combine IF formulas in one cell
Hello, I'm trying to create a %Complete column based on a drop down list column called "Status". For example, I'm looking to combine these formulas into one cell, then copy and paste to all other cells in the same column. I'm very new at this and cannot figure it out. If there is a better way top accomplish what I'm after,…
-
Criteria for Alerts and Actions Rule
My boss has a Smartsheet set up to send a Update Request 30 days before today. For example row 7 would look like ....=[Due_Date]7 - TODAY() Would this alert still be sent if Smartsheet was down for maintenance at the scheduled time the alert was to be sent, or if there were conflicting "work week/full week" settings?…
-
Formula Help
Hello New user needing help with formula. I would like it to be something like this: When the due date is => than today -1 turn red, if the due date is < today - 3 days turn yellow, if due date is is =. than today +5 turn green The idea is if a task is due today or tomorrow its red, if a task is due within 3-5 days its…
-
Column Status Formula
Hi Everyone, I have a status column with the following options: Not Started, In-progress, Complete, N/A. I've created a formula if the parent row is set at 'Not Started' then the sub-task would automatically change to 'Not Started'. Same with Complete and N/A. In-progress needs to work a little differently. The parent row…
-
Parent Sum IF
I've tried a variety of calculations, and can't seem to get the results I'm seeking. I'm simply trying to add up all of the parent rows in a column called Resource Days that are Assigned To a specific team member. Any suggestions? =SUMIFS(PARENT(Resource Days:Resource Days), [Assigned To]:[Assigned To], "Team Member")
-
Enhancement Request: Report Criteria What? on Dropdown column like Text/Number
When I have a Dropdown column for the What? criteria of a Report, my only option is some version of the "is one of" criteria. What I want is to be able to build the criteria like a Text/Number column, for example using "contains" Use Case: I have a drop down list like this: Building 1 Building 2 Building 3 Building 4…
-
Count & AVG only if another column contains "text"
Hi Again, After scouring discussion boards I have managed to Average the total of the rows, see below =IF((COUNT([Days to respond]194:[Days to respond]214)) = (COUNTIF([Days to respond]194:[Days to respond]214, 0)), 0, SUM([Days to respond]194:[Days to respond]214) / ((COUNT([Days to respond]194:[Days to respond]214))))…
-
Saving original cell value in another cell
I have a cell that holds a target date (Target Go-Live Date) and another cell that I want to hold the original date entered in the target date cell. This way if the Target Go-Live Date is changed, the other cell (Original Target Date) has that date saved in it. My thought was to only set Original Target Date = Target…
-
Help with nested IF statement using AND
Hello Community, I have created the below formula that SEEMS to be working but is not showing up with the color coding that typically happens when you have all your formula ducks in a row. It is returning a result, not an error, but I’m concerned there is still something missing since the text is showing up all black. See…