Parent Rows
Is there a way to remove the Start Date, End Date, and Duration from a parent row without Disabling Dependencies? We have an Alert set for the day after a due date in a column that has an unchecked Complete box. We are receiving alerts for our Parent columns which are not actual tasks. We could add a condition that the row…
-
Dependencies & Predecessor Dates
Hello, I am having trouble with predecessor dates. I would like the duration and dates to be set automatically for line 10 as Rows 9 and Rows 17 change to accommodate variables. I'd like the date to load as one day after the Finish Date of row 9, and end one day before the begin date of row 17. It isn't working out that…
-
Objective alignement matrix
hi, i want to create a matrix with all the objectives of the different divisions to see if they are aligned or not to multiple strat plan objectives. Should I have a seperate sheet of objectives for each division or have them all on the same sheet? Do I make a report to compare them? How can I do this ? i am lost in the…
-
Report vs workspace permissions
Hi all, can someone please verify whether the workspace-level permissions override the sheet or report-level permissions? For example, I have a user I'd like to have Viewer permission on the overall workspace but Editor permission on a specific report. He has Editor permission on the underlying source sheet (located…
-
Viewing Update Requests and Alerts
Is there any functionality in SmartSheet that will let me (the SmartSheet Owner) see what an Update Request or an Alert actually looks like to the end users. I understand I could send a TEST out to myself and see the Update Request as is happens but I make changes to these standard request often and it would be nice to…
-
Sending attachments
Hi, I send attachments from Smartsheet and my recipients received it in their 'spam folder'. How can we troubleshoot this issue? Thanks!
-
Number Positioning/Formatting on a dashboard
Is number positioning/formatting available on bar graphs in a dasboard?....any chart? My numbers all overlap and I can't figure out how to clean it up.
-
Trouble creating COUNTIFS
For the life of me I cant get SS to sum certain target values. For example I have an "Audit Status" column with drop down functions, some of these functions represent being "completed" and I have a sheet that I want to reference these variables as combined. i.e. Completed, Not Required, QC Complete, and Bypass QC all mean…
-
Feature Request - Cell History Graph
For all of my projects I need to track the overall % complete for the project and individual areas. I currently have Smartsheet calculating this information and displaying as a % in a cell, but I would like to be able to show how the % complete has trended over time. Is there a way to show the individual cell history as a…
-
Problems with Smartsheet Notifications Email
Hi, i have problems with Smartsheet Notifications email (smart tag). At the moment in which an email notification is sent, configured from the Alerts and Actions section with smart tags. The configuration is as follows: assigned area, text, Request Title; But what is coming to the mail trays is: assigned area, text,…