-
Smartsheet Form <> DocuSign Integration: Transmit Uploaded Files
Currently, the Smartsheet <> DocuSign integration allows Smartsheet users to map a Smartsheet form to a DocuSign template for efficient e-signature workflows. However, while a user can upload files to a Smartsheet form, those uploaded files can't be transmitted to DocuSign via mapping / integration, meaning the e-signersβ¦
-
Leading Zero in DD-Mon-YYYY
Can there be an option to enable the front Zero for the date format 27-Apr-2018? Right now it will show only a single digit for days 1-9, and the Zero is needed to make the numbers unambiguous. (I didn't make this rule, just have to follow it.)
-
Dynamic Reporting Linking Filters
I would like to make reports dynamic so that you can link filter options to another sheet. For Control center this would be great because you can have the intake sheet (Where the data lives) drive into the report and populate the results. We would like to see it linked so if you change the data on the intake sheet, theβ¦
-
Restore Workload View Access for Licensed Users After Enabling Resource Management
Request: Allow Smartsheet licensed users to retain basic workload view access after RM is enabled - without requiring an RM license. Restoring access improves user experience and avoids additional costs for previously available features. It also encourages wider adoption of RM. Our customer submitted the Support Caseβ¦
-
How saved filters work
I'm requesting that the parameters of a saved filter not be updated when I use that saved filter, add some more filters to dive into the data more, update some data fields, then click save. Intuitively to me that "save" should have just stored the data updates and shouldn't have updated the parameters of the saved filter.β¦
-
Auto Set Baseline
Provide method to automatically set baselines for projects that don't have a baseline. This would be an admin task to be able to see projects without baselines in a group/list and then create the baselines in bulk rather that opening each project to set a baseline.
-
Pause Workflow until Update / Approval Request is completed
It would be extremely helpful if during a workflow, when you have an Update / Approval Request, you had the option to have the workflow not go to the next step until either request was completed.
-
Embedding a Form in an Automation Message
I would love the ability to set-up an automation and embed a smartsheet form in the message. Currently, I can only add a link to the form.
-
Edit Default Messages for time-based alerts
Would be great if we could edit the default message that Smartsheet sends for time-based alerts when 6+ rows are triggered. I like that it groups requests into one email, but I want to update what the email message says. The text reads "please update my online sheet" which reads a little funny because we're sending theseβ¦
-
Add Workspace ID / Name to Sharing Report
The Workspace Sharing reports currently generate with the default names of "Workspace Sharing Permissions" and "Workspace Sheet Access" for every workspace. The reports themselves do not contain the name or ID of the workspace either. As a result, if you generate the report for more than one workspace, you cannotβ¦