DATAMESH - ONE DROPDOWN COLUMN DOES NOT UPDATE
Hi, I am wondering what should I do. I have 11 specifics sheet updating the mastersheet for 5 columns. everything updates except my status column. there is no formula in that column it is a dropdown column with 4 differents choices. my datamesh is built with update immediately all fields are well set up. I have cell link…
Bridge | How to Find Rows With Status & Delete Them
I'm trying to use Smartsheet Bridge to find all rows within a Jira Status column that are closed and have it delete those tasks (rows). I've been looking at multiple articles but am having a hard time referencing what rows match this cell and then delete.
Dynamic View - Share to A Group??
Hello all. Our team has a purchase request submission process using a smartsheet form, and then a dynamic view setup so that they can track the status and make updates to their request throughout the life of it. However, I also need managers of each department to have access to these requests. I have created smartsheet…
WorkApps (Dynamic View Link) Stopped Working
Hi All, Any ideas what might be going on? I am on the phone on hold for support and may not be able to hang on long enough today to speak with a live person. I created several pages in WorkApps for my boss and now several of them are not working. This has happened to several pages in this WorkApps but not all of them. What…
Live connection Tableau and Smartsheet
Can we make a live connection between tableau and Smartsheet using smartsheet_ldc_setup_64bit_1.4.34.0_Signed ? I am able to do extracts but not Live connection.
Control Center - Add Row to Metrics Sheets
Is there a way to leverage control center to add a new row to all provisioned projects metrics sheets. I have a lot of projects that are already provisioned, and I can't go in and add the rows manually.
Outlook Add-In Stopped working
This week my team has experienced our Outlook Add-in is not working. I have uninstalled and reinstalled. I have restarted the computer and placed a help ticket in but have not heard back yet. Has anyone else experienced this? Do you have a fix?
Blueprint Asset Settings – No Optional Setting Available?
This discussion was created from comments split from: Adding a new SHEET to Control Center projects.
Can I share my Sheet to an additional Workspace?
I have a sheet (Project Schedule) setup in my own Workspace. Another project owner would like to have my Project Schedule visible in his Workspace. Is it possible for a sheet to be active in two different workspaces at the same time?
Is there a way to use OR in a Dynamic View filter condition?
In a View, I can create a custom filter that selects where the Project Lead is "Mike" but I want to also say "OR Debbie." Is that possible? It looks like I can only choose AND.