-
Enable/Disable automation workflows across multiple sheets
My use case: I attended the PM workshop at ENGAGE where a lot of sheets had Automation workflows set up. I would wake up to about 20 unread emails because of these workflows. The only way to stop the email was to individually disable each workflow in all of the sheets. This feature would also be useful if I am looking to…
-
Reference Reports in Formulas (e.g. VLOOKUP) to sheets
It would be so nice to use a VLOOKUP to reference a report and pull what I need back to my sheet. Unfortunately, sheets can only pull from sheets.
-
Renaming Column Name in Report
1) Is it possible to change the Name of Column in Report instead of Source Sheet. 2) Auto Columns name is appearing in the Report instead of Column Name (Ex. Created by , Modified By, Created Date and Modified Date). Is there any way to change System Columns name in the Report. Thanks for your support. Best regards.
-
Request to be able to turn off default of 100% allocation
This new functionality will not work for us and will cause us to have to update every row: "Starting at the end of August 2024, new rows added with astart date, end date, and contact field in sheets connected to ResourceManagement by Smartsheet or with workload tracking enabled will automatically default to a 100%…
-
Request for Enhanced Hyperlink Functionality in Automated Notifications
Currently, when adding a hyperlink in an automated notification or alert, the only method available is to insert the full visible URL, like "http://salesforce.com". We need a feature that allows embedding the URL behind text, such as "Click here to go to Salesforce." Additionally, hyperlinks included in automation messages…
-
Edit Start, End, or Duration from Report
I'd like to be able to edit the Start Date, End Date, or Duration of a task from my report. At present I can only edit Start and Duration from a report because End is treated like a formula. This is problematic when I need to adjust both dates because it forces me or another user to do math (accounting for non-working…
-
Copying action while building Automation
Smartsheet should have option to copy a specific action and reuse it within the Automation. This will save a lot ot time of building Automation where repeative action needs to be places under different condition. Similar faicility is available in Microsoft Power Automate where user can copy some aciton and reuse the same…
-
More than one Baseline + Comments
Dear all, To enhance Smartsheet as a comprehensive PM Application, my company and I find that a crucial feature, baseline management, currently needs to be added. While the ability to set baselines is valuable, the limitation of only being able to set one baseline is a constraint. We propose the implementation of a feature…
-
Update Template
I would like to see an option to edit/update a template without using the template to create a sheet, editing the sheet, and saving as a new template. The current process creates additional templates that might have to be renamed and then removed. If we could edit the template itself, it would make the process much easier…
-
Option to Maintain Links when Moving or Copying a Row to a New Sheet
Develop a function, to provide the user with an option when using automation to MOVE or COPY a row to a new sheet, that will preserve the smartsheet cell link already in the cells of the row. Use Case: Often users build out sheets that utilize cell linking. When moving or copying a row to a new sheet, the links are not…