Modified SUCCESSORS() function to report more than just direct successors
WHY IS THIS USEFUL? This updated function would allow us to filter the spreadsheet for only the driving path to a particular row#. This would be similar to a filter for critical path, but enable much more flexibility. Current status: I've successfully generated a "Successors" column, listing direct successors of each row,…
-
Creating Periodic based off date stamp
Since the option to record a date in a work flow can not be added in before copying rows action there is a work around. First record a date when a date is reached, set to the conditions within the periodic. Finish by record a date, do not assign in this work flow or copy to a data base that is automated to distribute the…
-
Document builder error, when use two different languages in a cell
Document builder gives an error when using two different languages in a cell. It's okay if you only write in Korean. It's okay if you only use English. If you mix the two in one cell, the value will not be entered properly. Please fix it.
-
Need critical chain method
Project managers need the ability to use the critical chain method and fever charts.
-
DataMesh please utilize Column ID instead of Column Name
I often have issues with DataMesh breaking because it is mapping by column name, rather than columnID on the back end. Is there any way this can be updated so if I change a column name, it does not break our DataMesh workflows?
-
Data shuttle offload to Google Sheets
Hi can you please add file type google sheets to the offload file along with the existing excel and CSV. Many Thanks Shaun
-
Don't allow editing of workspace permissions when sharing an individual item
Managing sharing at the item level is proving very confusing for people. When trying to share an individual item most users don't realize that they need to leave the Workspace level sharing entry there and add a 2nd entry for item level sharing. Instead, they keep changing the workspace level permission, thinking they…
-
Access Request - With Additional Information
Currently Access Requests come as basically "I want access to this sheet". But the problem is, and I am sure others have encountered this also, the company is so big. And we are using Smartsheet at a global level. So what started out as a sheet, report, or dashboard for our team has now gone so far beyond that. I need to…
-
Report to list Smartsheet users who integrate with DocuSign
I would like a report/option to list users who are utilizing Connect to DocuSign. This will help me when it's time buy more DocuSign envelopes and have proper support.
-
Sync Client between Smartsheet Project Sheet and Resource Management
Hello, Currently we are using Smartsheet and its integration with Resource Management. Projects are created in Smartsheet with a defined template and then they're imported on Resource Management. When the project is created in the first system, a lot of information are entered there, such as the Client. It would be very…