Changing Finish Date based on % Complete Column to Update Schedule for Predecessor Tasks
Currently in a Project Sheet there is no way to automatically change a Date in the Finish column once the % Complete column changes to 100%. I am trying to have the schedule auto update the predecessors start and end date based on the date the ancestor task actually was completed. There is currently no way to automatically…
-
Allow Deactivation of all Workflows at once
Create an option by which all workflow automations can be deactivated or activated as a group instead of having to do them individually. Or create a check box for each automation and be able to select a group of automations to activate/deactive as a group.
-
(Grid View) Cell and Column Data Validation Rules
What if we could add required value and data validation rules to any text/number columns. This could be to enforce either blank or a value matching the formatting, but would help with data validation across the board. My use case, in particular, is that I pull in data from Smartsheet to a data model and data visualization…
-
Change Formatting in Reports
It would be very convenient to be able to format a report different than the sheet. One purpose of a report is to bring multiple sheets of data together, but often those different sheets have different formatting which can make your report look awful. If you could format your report at the report level, it would solve all…
-
Generate Documents with Adobe Sign
Please add Adobe Sign as an option in the "Generate Document" feature.
-
Attachment at the end of generated documents
For my application, we would need to have the option to add the line's attachments at the end of the generated document. I use Smartsheet for my RFI: I use a form to collect the questions and other data and I then automatically print the answer with the "generate document" tool when the question is answered. It works well,…
-
Select multiple records to fill in a document
We use Smartsheet to record RFQs from our customers. We'd like to use the document creator, but we'd like to be able to select multiple records to to populate a single document.
-
General timeline for Gantt view
Hi Smartsheet technical team, Very often similar projects or recurring projects follow the same time schedule where specific dates are unnecessary. It will be good if the Gantt view can show a timeline without specific dates and that will give a general overview of the timeline to all stakeholders of the project. Thank you!
-
Datasources for Dropdown Menus
A sorely missing feature from Smartsheets right now is the ability to link dropdown menus to a central datasource - currently when designing sheets with dropdown menus, you need to manually update every sheet where the list exists making change management a pain. If we could populate those dropdown menus from a reference…
-
Dynamic dropdowns - Waterfall request
The Contact List, Dropdown (Single Select), and Dropdown (Multi Select), are useful tools to control data entry. The problem is they require a lot of maintenance. Through Bridges, we have a sheet that is populated with information from our ADP. It contains all of our employees. Using a Contact List column and selecting the…