-
Individual License Options
It would be really nice to have more options when having an individual account that is just one license. I use my personal license to handle home income budgets and chores for the house, but my reports for the family is restrictive without being able to group and summarize. Please Please come out with more options for the…
-
Remove formulas in data shuttle
Data shuttle does not allow formulas to be turned off so when I upload an excel file in data shuttle, my numbers are being rounded.
-
Control Center Project Link - Global Change to Rename & HyperLink Change
Please consider added Control Center global change functionality to be able to rename the project links for already provisioned projects. In addition add a control center global change to be able to change the associated hyper link for the already provisioned projects. I run a control center blueprint program for a large…
-
Form Confirmation Email Improvment - Quality of LIfe
When users submit an Non-Conformance Report (NCR) using smartsheet forms we generate a NCR# for the issue. I would like our confirmation email/message to tell the user what that NCR# is, instead of forcing them to log in, open smartsheets, and find that number.
-
Select multiple options for symbol dropdown
I would like the ability to select multiple symbol options per columns. As an example, certain rows I want to select a color dot, but other rows I would like to select the check mark or flag. Adding more color options for symbol dots would be great as well.
-
Progress Bar on Smartsheet Forms
I would love to be able to add a progress bar on a Smartsheet Form, so that as a user completes fields, they can see how close they are to completing it. Generally speaking I find Smartsheet Forms to be much more functional than Google Forms, but this is one feature that Google Forms have but Smartsheet is missing! Thank…
-
Form Pages
as a user i want to divide forms in pages so that when the form is long i can focus better restarting fresh from the top rather then continuosly scroll vertically , Pages are also useful to divide the form depending of the argument Using multiple forms is not a good workaround cause the user can decide to complete only the…
-
Proofing: Check box to included same people from version 1
Once an invite list of people is built for the 1st proof—I'd love it if there was a checkbox on the "Invite reviewers" dialog box screen for 2nd proof and on to include a check box to include the same people from version 1. It is a real pain to have to rebuild the "to" list when it's already existing. If it populated it…
-
Conditional formatting for rows with an attachment
As the attachment (paperclip) column is on the far left of the sheet and can't be repositioned, it's not always clear when an attachment has already been added to a row (as I often don't scroll far left to check, especially in sheets with multiple columns). Is there an easy way to use conditional formatting to identify and…
-
Control Center: New Admin Permissions levels
When using Control Center, there needs to be two distinct Admin permissions levels: A Control Center Admin level with its current permissions (that potentially could affect/break Control Center functionality) but also distinguishes control center locks and configurations from sheet-level locks and configurations. A lower…