-
Folder-level permissions
I have a Workspace with folders for different teams. Is it possible to give access to certain folders and not the entire workspace? Currently I am giving everyone viewing access to the Workspace and the editing access to specific sheets. It would be nice to manage the access rights on folder level
-
Increase Bridge Run Log Entry Limit / Update Error Prompt
If an individual Bridge run log entry exceeds 4mb of data, you'll see the error message “Run logs aren’t loading right now…” with a suggestion to check your internet connection. The error prompt is incorrect, and unhelpful. Improve the usage of Bridge by increasing the data load limit to align against the limitations…
-
Auto-Save
The save duration is too long: 1 minute when we are not processing, when we are processing we have to keep pressing save. Is it possible to save automatically when entered? Or shorten the duration to 5-10 seconds. Even Gsheet can save automatically :/
-
Side bar shortcut to forms
I think it would be beneficial to have a side bar shortcut to forms, since forms sit in the sheet it would be super to have a quick way to access. Thank you in advance for your consideration.
-
Include Row Hyperlink in Alerts
Any automated alert that references a row should have a hyperlink to the row referenced. There is currently only a hyperlink to the entire page. This should be possible as row links are available in row properties, so the metadata is there to leverage. Please make it happen Smartsheet!
-
Form URLs should automatically update on newly saved dashboards when copying a workspace template
As a user, I would like form URLs to automatically update on newly saved dashboards when copying a workspace, So that I do not have to manually update the Form URLs and prevent the risk of forms accidentally pointing to the original sheet or workspace. Please refer to case # 05972330, as this had been previously assumed to…
-
Sheet/Workspace access request should go to owner and admin not just owner
We provision our project workspaces through control center and the account we login and do that with is a service account. Sheet request only go to the "Owner" which is a service account so the request are going to the Outlook account created for that, this isn't checked by anyone regularly and we are missing these…
-
Rearrange items in collections
I need the ability to easily re-arrange items in Collections, preferably via drag-and-drop.
-
Remove GO to sheet option
There should be a way to remove the "Go to the Sheet" button / link at the bottom of an update request. Often users do not have access and then they keep requesting access by using this link.
-
Link Resource Management "Phase" of a project to data in Smartsheet
It would be useful if a project's "phase" could come from a cell in Smartsheet so the phase of a project doesn't need to be updated in two different places. Example: A project moves from Planning to Execution. As a PMO Manager, I would like to be able to update that in the Smartsheet Portfolio Rollup Sheet for that…