Control Center Global Update for Dashboards not creating "timeline" widgets
Hello. I've been working on updating a couple of dashboards that contain the "Timeline" widget via Global Updates in Control Center. When running the Update Dashboard test in Control Center, the widget is not being created and instead there is a bunch of blank space where the timeline widget should be. The blueprintโฆ
-
Excel Tab Changes Impacting Data Shuttle
Hi - I have a data shuttle set up from a shared Excel file into a smartsheet that I use to basically alert me when changes are made to the excel by users other than myself. When I set up the data shuttle, the tab that I was referencing was Tab 1. Now the users have moved the tab and it is Tab 3. Do I need to update my Dataโฆ
-
Regional date format issue in cross sheet reference
Hi, we use control center to roll out project toolkits, the intake sheet includes a start and end date for contracts. These dates pull through to a metadata sheet then to various other assets in the toolkit. To set up I right click the cell and select 'Link from cell in other sheet' and link to the relevant cell in theโฆ
-
Dynamic View does not allow anyone to change and save specific column
I have a column with a dropdown list. The column is restricted to listed values, and you can select more than one. There is no logic assigned to that column in the dynamic view, and is not listed as required. I've tried disabling the conditional logic on the sheet, and it did not correct the issue. This is happening toโฆ
-
How to complete a true Dynamic Linkage between Plans at the Milestone Level
I am looking to establish a dynamic link between two project plans. My goal is to surface milestone-level tasks from a Master Plan into a secondary sheet. Specifically, I need to ensure that updates to dates or status in the Master Plan are reflected in the secondary sheet, and I'm curious if Smartsheet can maintain orโฆ
-
Integrations and Connectors
Has anyone integrated Smartsheet with Springpoint's Software product, Motorbase?
-
Dynamic View Multi-Criteria Form Logic
I am trying to create a form / dynamic view that will display fields when 2 columns meet specific criteria I see there is a "Multi-Criteria Form Logic" link in dynamic view but when I click, it directs me to the sheet. I can't find any resources on this feature or how to set it up. Can anyone guide me?
-
Multi-tier reporting in Control Center?
I am looking for a way to set up a report in my parent blueprint so that: Every time a new child project is provisioned, a specific sheet from that project is added to the report at the parent level. The parent report is a collection of that sheet in all child projects. Things I tried that didn't work: -Adding the childโฆ
-
Data Mesh
I set up a Data Mesh to sync contacts between 2 sheets. The goal is to sync the drop down contact list. Both columns are set to Contacts. However, when I get to the set up screen Confirm and Create, the Lookup Values field in the Source sheet is black and I can't manually add it. IT was set up correctly in the Map Sheetโฆ
-
Control Center Profile Data - Appearing in the wrong column
Hi, I think I have a strange behaivour in one of the Profile Data parameters set in Control Center. Even that I do designate a Target Column as "Date" for the Profile Data in SCC, this data keeps appearing always in the default column in the template: text/number column to the right of the Primary Column in the templateโฆ