-
Dynamic View - View Not Showing
Hi Smartsheets Community, We recently got Dynamic View and I am in need of some help. I have created a Dynamic View from an existing sheet. When I click on show view, none of the data is showing up in the view. For context, I have provided screenshots below. Does anyone have any ideas on what I am doing wrong for theโฆ
-
Steps to Enable Large Sheet in Table View
Hello, Can you share the specific steps I need to take to enable Large Sheet in Table View? I have an Enterprise account and am a part of the EAP. I see this article but it doesn't give the step-by-step instructions to enable Large Sheet. Thank you, Will
-
Silent Data Loss in Dynamic View for Unlicensed Users (4,000-Character Limit)
Iโm raising a serious usability concern with Smartsheetโs 4,000-character limit, particularly when data is entered through Dynamic View by unlicensed users who have no visibility into that limit. In this case, an unlicensed user entered detailed meeting notes directly into Dynamic View. Once the limit was exceeded, theโฆ
-
Portfolio WorkApps Not Displaying Projects in Project List
So I am working with building out a Portfolio WorkApp for one of my programs that I have built. When I get it all set up, I can see the projects that I have created for the program on the projects list, but when I hit preview to look to see if it's looking the way I need it to based on the roles, none of the projects showโฆ
-
Data Mesh - Can you have 2 Data Mesh Configurations go into the same target sheet?
I have 2 different Smartsheets, one for design and one for construction. Each of these sheets have several different date columns that I would like to capture in a single target sheet. I can get the initial design information into the target sheet, but the construction sheet wants to create new rows instead of completingโฆ
-
Issues connecting to Entra ID for SSO
I'm looking to integrate SmartSheet with Entra ID. The goal is to configure SSO and have auto-provisioning. I've followed some of the steps provided already and seem to do what is expected? Is there more documentation somewhere that can provide some clarity?
-
Smartsheet Integration with MS AD without Enterprise Licensing
Hello, One of our prospect clients is interested in an integration between Smartsheet and MS Active Directory. They said they only need to verify if the user is active in AD before authorizing their access to Smartsheet. We spoke about this through an Enterprise License, but they cannot afford it. We are wondering whetherโฆ
-
Control Center Archiving with Parent/Child Relationship
Hi, we are in desperate need to archive thousand of jobs created with Parent/Child blueprints. We have other archiving systems for standard templates, but the directions don't apply in this situations. Can anyone point us in the right direction?
-
Can't Save Field Logic Updates in Dynamic View
Hi all, I've seen a few similar posts regarding this, but they were from a few years back so not sure if anything has changed. I want to add Field Logic to a field in our form. It asks the user to select a Category and to deter using Issues/Miscellaneous, I have added a dropdown column in the sheet for the user to confirmโฆ
-
Jira Connector Error: 400 Bad Request (Required Fields Unidirectional from Jira)
This discussion was created from comments split from: Jira Connector - Required Field in Jira is listed as unidirectional.