-
Control Center Deleting Intake Rows
We had 2 items that were created incorrectly in our multi-tier Control Center. We unchecked the created boxes on the intake and deleted them from inside Control Center with the intention of recreating them after applying a fix. We have done this before with other Control Centers when we spin them up as part of the testing…
-
Data Shuttle converting mmm d, yyyy date format to numerical value
Hello Everyone, I have a Data Shuttle workflow that has been run virtually every business day for over a year. When running today, four columns of dates converted to numerical values. No formatting of the source sheet has changed (Excel file with a Custom category of mmm d,yyyy Cell history confirms date format used to be…
-
Is it possible to offload data into data shuttle from a report?
Is it possible to offload data into data shuttle from a report and not just a sheet?
-
Control Center Not Populating Created Projects
I'm just figuring out how Control Center works. I have my templates and blueprints set up. When I create a project manually with the Control Center, the app isn't checking the Project Sheet Created Box column that I selected as the value for created projects. Is there a step I'm missing here? I also can't get the automatic…
-
I have a blank sheet that i want to populate with only the column values from another that contain X
Hello I have a fresh blank sheet, and another data sheet that for example contains the Columns: Fruits, Fruit price/kg, Inventory, etc I want to in my new blank sheet have a Fruit column that only includes the ones with string "apple" so data sheet may contain: Pineapple, green apple, red apple, AND, Orange, Banana,…
-
Data Shuttle issue
This discussion was created from comments split from: Error Message on Offload workflow in Data Shuttle.
-
Task Sheet Global Update
I have updated my "health" column in my task sheet with new formulas and new symbols. I am trying to figure out how to update all my existing projects to have the same symbols and formulas by doing a global update. I chose "find and replace" then my task sheet. What should I enter as my find string?
-
Jira Connector Workflow is not bringing over Jira System populated fields or Jira Formula fields
Hi! I have two fields that are not coming over in my sheet from Jira. One is a field that is generated by the system when it looks at the status of related tickets that are not directly in the project that I'm linking in the workflow The second is a column that is a formula in Jira that calculates a weighted score based on…
-
Data Shuttle is not finding all columns in the source sheet
I am trying to use data shuttle to upload data from an excel file in SharePoint but when I get to the mapping part, the column names are completely different from the source. Almost as if it is not pulling the data from the sheet I specified, but a different one. I am using the second tab of the excel sheet and some of the…
-
Data Shuttle - trigger from email to sheet
I have a sheet that I currently update using a CSV file that is emailed to me weekly. I set-up a Data Shuttle to run upon attachment that works great. But I'm trying to remove a step. Is there a way to email an attachment to a specific sheet that would then trigger the Data Shuttle so I don't have to manually upload each…