New Columns in SCC and Summary Sheets
Hello - we have added new columns via SCC and all MetaData and Summary Sheets. Any projects provisioned from the day we added forward are populating. Is there a way to refresh data on previously provisioned projects to get the data to populate?
-
Datashuttle: source not found when updated
I have a situation where a SharePoint folder is updated every week by uploading a file with the same name and columns each time. I have set up a Data Shuttle to upload this data to a datatable, but it doesn't work because the file is deleted and replaced. What other solutions do you suggest?
-
Smartsheet to Salesforce Connector - Starting Over
I the SmartSheet Connector setup where it imports in using a two way sync with all the fields pointing from SmartSheet one direction to Salesforce. I need to start over so I tried to delete the record Id from the smartsheet column and run the workflow rule again. That was unsuccessful it just spun. How do I start over withโฆ
-
can you "view as" in dynamic view set up?
I'm renewing the settings for our portfolio of dynamic views and doing some clean up. As I complete, I'd like to be able to "view as Amber" or "view as Anthony" so I can ensure my end users are having the experience I believe I've designed. It feels like this is an obvious feature, but I don't see a way to do that. Am Iโฆ
-
Does Power BI see checkbox field as TRUE, FALSE, or blank?
I use the Smartsheet connector in Power BI. I have a "Closed" field in Smartsheet, it's a checkbox. Check it when a record is closed. Then in my Power BI dashboard I have a filter. It shows active records when Closed is FALSE and inactive records when Closed is TRUE. Well today a user told me that he reactivated a recordโฆ
-
Auto direct risk from master register to project risk
I have a master risk register with a column controlled by Bridge to update when a new project is spun up in Control Centre.. that way it's easier for people to add risks for a project. Is there a way to automatically divert the risk from the master register to the respective project register? I have the project code asโฆ
-
WorkApp Creation is not working
I need to create a workapp, when i go to workapps and click on "Create an App" i am asked to contact customer service instead of intiating App creationโฆ. anyone knows why? any suggestions?
-
Unable to Update Profile Data in Control Centre
Hi, when I create a new project in Control Centre, I get this error message just for this one column. I reference this field the same as every other field. It USED to work and stopped working about a week ago. Any ideas why just one field will not update to my Metadata? I have triple checked spelling and spacing. Thanks
-
Summary Sheet Not Connecting to Correct Column
I have a summary sheet set up for my projects, which is connected to a metadata sheet I have. In the metadata sheet, I have column types for different types of data (contact, text/number, date, etc). In my summary sheet, the columns that should be looking at the text/number column for data are looking at the contact columnโฆ
-
Metadata to Summary Sheet
I am having a problem where my Summary Sheet is trying to pull data from the wrong column in my Metadata sheet. The data in Metadata is in my date column, yet the link is taking from the text column. Can anyone share a way to change the link.