-
Document Builder in .GOV
Why hasn't Smartsheet.Gov updated to have Document Builder feature? We were told when we transitioned over from Legacy, for security reasons, it would be added in June 2025. That was an important feature I needed to generate reports as required by contract. I'm advising our compnay to get rid of smartsheet and go to a more…
-
Inconsistent Formatting in Dynamic View
I have added colors to columns, but it seems to inconsistently format in the Dynamic View as seen in this screenshot. Does anyone have any advice or feedback? Thanks, Jeanna Wright
-
Dynamic View Functionality
When will Dynamic View be able to function with similar scenario features that Smartsheet Core has? -Multi select -And/Or Additional request is to be able to upload multiple documents at the same time. This has been a request for 2 or more years with no response on when this will occur.
-
Dynamic View does not "honor" the drop down selections
I have a Dynamic View built off of a sheet, which has - say 200 names as potential contacts to select from. I have confirmed that in the intake form, and in the sheet itself, the choices are selectable. However, in Dynamic View, the names selecting seem to be selecting from a master list of users, and not just the list of…
-
Smartsheet Integration with MS TEAMS
Hello! I have created a collision calendar within Smartsheet Calendar and have it posted in a dashboard format on Smartsheet. I would like to add it as an app integration into a Microsoft TEAMS site. So, when a member of the TEAMS site goes to it they can easily click at the top beside "shared" or "files" and have a…
-
Control Center Global Update for Dashboards not creating "timeline" widgets
Hello. I've been working on updating a couple of dashboards that contain the "Timeline" widget via Global Updates in Control Center. When running the Update Dashboard test in Control Center, the widget is not being created and instead there is a bunch of blank space where the timeline widget should be. The blueprint…
-
Excel Tab Changes Impacting Data Shuttle
Hi - I have a data shuttle set up from a shared Excel file into a smartsheet that I use to basically alert me when changes are made to the excel by users other than myself. When I set up the data shuttle, the tab that I was referencing was Tab 1. Now the users have moved the tab and it is Tab 3. Do I need to update my Data…
-
Regional date format issue in cross sheet reference
Hi, we use control center to roll out project toolkits, the intake sheet includes a start and end date for contracts. These dates pull through to a metadata sheet then to various other assets in the toolkit. To set up I right click the cell and select 'Link from cell in other sheet' and link to the relevant cell in the…
-
Dynamic View does not allow anyone to change and save specific column
I have a column with a dropdown list. The column is restricted to listed values, and you can select more than one. There is no logic assigned to that column in the dynamic view, and is not listed as required. I've tried disabling the conditional logic on the sheet, and it did not correct the issue. This is happening to…
-
How to complete a true Dynamic Linkage between Plans at the Milestone Level
I am looking to establish a dynamic link between two project plans. My goal is to surface milestone-level tasks from a Master Plan into a secondary sheet. Specifically, I need to ensure that updates to dates or status in the Master Plan are reflected in the secondary sheet, and I'm curious if Smartsheet can maintain or…